How to Plan Colored Anti-Slip Pavement Installation

APPLICATION GUIDE

How to Plan Colored Anti-Slip Pavement Installation

A planning checklist to use alongside the approved installation instructions and safety data sheet.

A planning checklist to use alongside the approved installation instructions and safety data sheet. Use the following steps as a starting point for your discussion with the project team.

01

Prepare the specification

Confirm substrate condition, system build-up, selected samples, grading, area and site constraints. Obtain the current installation guide and SDS; this article does not replace them.

02

Review supplied PU quantities

The supplied TDS lists a 25 kg binder set of 20 kg binder and 5 kg hardener, a 4:1 ratio by weight, nominal 3 mm thickness and approximately 5 kg aggregate per m². Binder consumption depends on the substrate.

03

Confirm site application and reopening

Follow the approved method and product label, assess actual consumption through a site trial and agree traffic reopening conditions. The laboratory drying result is not a guaranteed reopening time.

YOUR NEXT STEP

Bring your project requirements together.

Keep the selected sample, application details and supporting documents in one place before requesting a quotation.

Explore the technical library
Back to all articlesFUXIN · Material Studio
LET'S TALK ABOUT YOUR PROJECT

From a color idea to a clear specification.

Discuss samples, material requirements and the documents your project needs.

Discuss your project